
Internal brick partitions
Define rooms with 12 cm non-loadbearing hollow-brick partitions, ready for the next finishing stage.

Building works
A dry-construction partition scope for reorganising offices and interior spaces.
No payment is taken. Build a list to request a quotation.
100 m² of framed partition with two plasterboard sheets on each side, fixing and joint finishing.
Doors, electrical services, painting, certified fire or acoustic performance and structural work.

The double-layer plasterboard package covers the framed wall and joint finishing. Door positions, electrical routes and the final decoration need to be considered alongside it, even when supplied under separate work items.
Review the measured area, finish and agreed details together. Any outstanding items are recorded against the quotation before the work is closed.

Define rooms with 12 cm non-loadbearing hollow-brick partitions, ready for the next finishing stage.

Establish a level floor base before the final surface is installed.