Costitalia
Reinforced floor screed

Building works

Reinforced floor screed

Establish a level floor base before the final surface is installed.

€9,400300 m² · one service packageIndicative package price excluding VAT. The final price is confirmed in a written quotation for your property.

No payment is taken. Build a list to request a quotation.

Included in this scope

300 m² of 5 cm C16/20 screed with B450C reinforcement mesh (5 mm wire, 100 × 100 mm spacing) on a prepared substrate.

Outside this scope

Structural slabs, excavation, demolition, insulation, underfloor heating and final flooring.

Preparing measurements and materials for the quotation

Connect the base to the final floor

This reinforced screed is one layer in the floor build-up. Share the intended final covering and existing levels so the prepared base, thickness and transitions to adjacent rooms can be considered together.

  • Measured floor area and existing base
  • Door thresholds and adjacent finished levels
  • Final covering and any separate insulation or heating work

At handover

Review the measured area, finish and agreed details together. Any outstanding items are recorded against the quotation before the work is closed.

Related work

Tell us about your property.

Start a project conversation