Building notes
Before you choose a finish.
How do you prepare a useful site brief? What is included in laying a floor, and what needs checking beneath a waterproof membrane? These notes explain the decisions behind Costitalia’s service catalogue, from measuring the existing space to choosing a finish and arranging façade access.

Planning the workWhat to prepare before a site visit
Site details, measurements and material choices to prepare before discussing the work.
Read the guide ↗
Waterproofing starts below the surface
Substrates, falls and junctions deserve attention before choosing a membrane.

Floor laying: what the price includes
Read a flooring price alongside its area, base condition and exclusions.

Plan facade finishes together with access
The coating is one part of an exterior works brief.